<em id="aepuz"><em id="aepuz"></em></em>
      <strong id="aepuz"><dl id="aepuz"></dl></strong>
        Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

        Aluminum alloy sacrificial anode

        magnesium anode, zinc anode

        Telephone:

        0391-7588881 +8618739187123

        Jiaozuo Libo Light Alloy Co., Ltd.

        News

        News

        Contact

        Phone:18739187123

        hotline:0391-7588881

        E-mail:970512272@qq.com

        Address:Wuzhi County, Jiaozuo City, China

        Q & A

        Where the current test pile is installed, does it need to test the pile at potential?

        • Author:Libo
        • Source:wm.gofitnessfreak.com
        • Date:2021-06-11
        • Click:0

        The current test pile is mainly used to detect the current in the pipeline, while the potential test pile is mainly used to detect the protection point. Generally, a test pile is installed at 1km and a current test pile at 10km during construction, so the potential test pile is generally not required where the current test pile is installed.

        Online
        聯(lián)系方式

        熱線電話

        18739187123

        上班時間

        周一到周五

        公司電話

        0391-7588881

        国产V精品一区二区三区,亚洲另类国产欧美一区二区,国产精品嫩模大尺度视频,四虎国产精品永久地址49

          <em id="aepuz"><em id="aepuz"></em></em>
            <strong id="aepuz"><dl id="aepuz"></dl></strong>